This tunnel was on the original PRR alignment. It was decommissioned after the newer / larger tunnel was heightened to accommodate double stacks. |
Date:
5/9/2018 |
Location:
Barree, PA Map |
Views:
169 |
Collection Of:
Bob Krug |
|
Author: Bob Krug
|
|
Picture Categories: Tunnel |
This picture is part of album: Barree, PA on the old PRR Middle Division |