With the entire Circus train tied down, the engineer backs the slug set down 2-Drill to the Yard Office. They will have a 1/2 hour break and the its back to the port to pick up wind turbine blades and nacelles. They will be working past midnite.         
Date: 6/17/2008 Location: Pensacola, FL   Map Show Pensacola on a rail map Views: 432 Collection Of:   Jim Larduskey
Locomotives: CSX 6956(GP40-2)    Author:  Jim Larduskey
With the entire Circus train tied down, the engineer backs the slug set down 2-Drill to the Yard Office. They will have a 1/2 hour break and the its back to the port to pick up wind turbine blades and nacelles. They will be working past midnite.
Picture Categories: This picture is part of album:  How to Unload a Circus Train
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1256181