080415002 Signal masts being installed at new BNSF 1st St. North junction on Wayzata Sub.
2 sifnal masts installed, 2 foundations still waiting. Looks like double crossover(?) is possibly coming.
Date:
4/15/2008
Location:
Minneapolis, MN
Views:
163
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Signal,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1126438