080301011 Construction resumes on BNSF Northtown Yards "South Runner" at CTC 44th
New high-speed switches being installed suggest upcoming realignment of mainlines
Date:
3/1/2008
Location:
Minneapolis, MN
Views:
278
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Yard,Signal,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1068461