080103002 BNSF track crew doing mid-winter work on panel switch on Wayzata Sub. Stadium Bypass
Date:
1/3/2008
Location:
Minneapolis, MN
Views:
373
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Winter,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1003679